Skip navigation

Use este identificador para citar ou linkar para este item: https://repositorio.ufpb.br/jspui/handle/123456789/24918
Registro completo de metadados
Campo DCValorIdioma
dc.creatorOliveira, Fellipe André Lucena de-
dc.date.accessioned2022-10-13T13:19:33Z-
dc.date.available2022-08-30-
dc.date.available2022-10-13T13:19:33Z-
dc.date.issued2022-07-22-
dc.identifier.urihttps://repositorio.ufpb.br/jspui/handle/123456789/24918-
dc.description.abstractIn this work, the problem of medium voltage collector networks optimal planning, with focus on wind farms, is solved using an optimization model based on binary programming. The model is taken from a relevant work in the literature and refined in this dissertation with the proposal of some contributions that aim to increase the model’s fidelity to reality and decrease the optimization algorithm execution time. The collector networks of generation plants have a great number of feasible configurations, which increases in combinatorial explosion with the amount of machines existing in the farm and the number of cable types considered, which makes impossible the analysis of all configurations in order to determine the best network topology. The proposed optimization model seeks to minimize the sum of investment cost and grid energy losses cost over a planning horizon, considering radiality, connectivity, voltage limits and cable ampacity constraints, and was tested with farms of 25, 50 and 57 wind turbines, in which competent solutions were obtained. The proposed method was validated based on tests with real plants of 25 and 57 wind turbines, in which competent solutions were obtained. The use of the improved model with contributions given by this work leads to new optimal collector network solutions for the same problem, with lower total costs and shorter optimization processing time.pt_BR
dc.description.provenanceSubmitted by Fernando Augusto Alves Vieira (fernandovieira@biblioteca.ufpb.br) on 2022-10-04T16:18:31Z No. of bitstreams: 2 license_rdf: 805 bytes, checksum: c4c98de35c20c53220c07884f4def27c (MD5) FellipeAndréLucenaDeOliveira_Dissert.pdf: 1277685 bytes, checksum: 4bfa00aa1feba2ed4f937b9975fce8b9 (MD5)en
dc.description.provenanceApproved for entry into archive by Biblioteca Digital de Teses e Dissertações BDTD (bdtd@biblioteca.ufpb.br) on 2022-10-13T13:19:33Z (GMT) No. of bitstreams: 2 license_rdf: 805 bytes, checksum: c4c98de35c20c53220c07884f4def27c (MD5) FellipeAndréLucenaDeOliveira_Dissert.pdf: 1277685 bytes, checksum: 4bfa00aa1feba2ed4f937b9975fce8b9 (MD5)en
dc.description.provenanceMade available in DSpace on 2022-10-13T13:19:33Z (GMT). No. of bitstreams: 2 license_rdf: 805 bytes, checksum: c4c98de35c20c53220c07884f4def27c (MD5) FellipeAndréLucenaDeOliveira_Dissert.pdf: 1277685 bytes, checksum: 4bfa00aa1feba2ed4f937b9975fce8b9 (MD5) Previous issue date: 2022-07-22en
dc.description.sponsorshipCoordenação de Aperfeiçoamento de Pessoal de Nível Superior - CAPESpt_BR
dc.languageporpt_BR
dc.publisherUniversidade Federal da Paraíbapt_BR
dc.rightsAcesso abertopt_BR
dc.rightsAttribution-NoDerivs 3.0 Brazil*
dc.rights.urihttp://creativecommons.org/licenses/by-nd/3.0/br/*
dc.subjectOtimizaçãopt_BR
dc.subjectParques eólicospt_BR
dc.subjectProgramação linearpt_BR
dc.subjectRedes coletoraspt_BR
dc.subjectOptimizationpt_BR
dc.subjectWind farmspt_BR
dc.subjectLinear programmingpt_BR
dc.subjectCollector networkspt_BR
dc.titleProjeto ótimo de redes coletoras de média tensão utilizando programação bináriapt_BR
dc.typeDissertaçãopt_BR
dc.contributor.advisor1Braz, Helon David de Macedo-
dc.contributor.advisor1Latteshttp://lattes.cnpq.br/4756997631027455pt_BR
dc.creator.Latteshttp://lattes.cnpq.br/9872838302612476pt_BR
dc.description.resumoO problema do planejamento ótimo de redes coletoras de média tensão, com foco em parques de geração eólica, é resolvido utilizando-se um modelo de otimização baseado em programação binária. O modelo é obtido de um trabalho relevante da literatura e aperfeiçoado nesta dissertação com a proposição de algumas contribuições que visam aumentar a fidelidade do modelo à realidade e diminuir o tempo de execução do algoritmo de otimização. As redes coletoras de empreendimentos de geração possuem muitas configu rações factíveis, que aumentam em explosão combinatória com a quantidade de máquinas existentes no parque e o número de tipos de condutores considerado, o que inviabiliza a análise de todas as possibilidades para que se determine a melhor topologia de rede. O mo delo de otimização proposto busca minimizar a soma do custo de investimento com o custo das perdas de energia da rede ao longo de um horizonte de planejamento, considerando as restrições de radialidade, conectividade, limites de tensão e ampacidade dos condutores, e foi submetido a testes com parques eólicos de 25, 50 e 57 aerogeradores, nos quais se verificou a obtenção de soluções competentes. A utilização do modelo aperfeiçoado com as contribuições dadas por este trabalho leva a novas soluções ótimas de redes coletoras para o mesmo problema, com menores custos totais e menor tempo de processamento da otimização.pt_BR
dc.publisher.countryBrasilpt_BR
dc.publisher.departmentEngenharia Elétricapt_BR
dc.publisher.programPrograma de Pós-Graduação em Engenharia Elétricapt_BR
dc.publisher.initialsUFPBpt_BR
dc.subject.cnpqCNPQ::ENGENHARIAS::ENGENHARIA ELETRICApt_BR
Aparece nas coleções:Centro de Energias Alternativas e Renováveis (CEAR) - Programa de Pós-Graduação em Engenharia Elétrica

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
FellipeAndréLucenaDeOliveira_Dissert.pdf1,25 MBAdobe PDFVisualizar/Abrir


Este item está licenciada sob uma Licença Creative Commons Creative Commons